Dumpster & porta potty rental nationwide. Phones answered 24/7.Call (844) 392-5596
Call today, 24/7(844) 392-5596Call nowCall

Construction Dumpster Rental

Most construction jobs use a 20, 30 or 40 yard roll-off dumpster. A 20 suits a remodel or a small addition, a 30 handles framing and drywall waste on new homes, and a 40 fits large builds with light, bulky debris. We book it with a local hauler and schedule swaps and pickups for you.

Updated 2026-11-05 · Your flat-rate quote includes delivery, pickup and a weight allowance, and it is spelled out before you book. No hidden fees.

Large roll-off dumpster at a residential construction site

Planning your construction dumpster

Pick the size by debris type

Framing lumber, drywall and packaging are bulky and light, so they suit 30 and 40 yard containers. Concrete, brick, tile and dirt are heavy and belong in a 10 or 20 yard container, often kept separate.

Plan the placement

The roll-off truck needs a straight, clear approach and overhead clearance to set the container down. Mark the spot before delivery day and keep it clear of materials and vehicles.

Ask about swaps

On longer jobs the hauler can pull a full container and drop an empty one. Tell us your schedule and we book the swaps with the order.

Keep heavy debris separate

Many haulers handle clean concrete, brick or dirt differently from mixed debris. Tell us what's going in so the quote matches the load.

Sizes for construction projects

SizeTypical dimensionsPickup-truck loadsGood for
20 yard22 ft long x 8 ft wide x 4.5 ft highabout 6Whole-home cleanouts, most roof tear-offs, larger remodels, deck and fence removal
30 yard22 ft long x 8 ft wide x 6 ft highabout 9New construction, additions, major renovations, large estate cleanouts
40 yard22 ft long x 8 ft wide x 8 ft highabout 12Commercial cleanouts, large construction and demolition, big roofing jobs on commercial buildings

Dimensions and pickup-truck equivalents are typical figures. Exact container sizes, weight allowances and which sizes are available vary by hauler and are confirmed on your quote.

How booking works

1

Call us

Tell us the address, the project, the size you think you need and your dates. Phones are answered 24/7.

2

We book it

We find a local hauler that serves your address, give you a flat-rate quote and book the dumpster for you.

3

Fill it, we pick it up

The hauler drops it off. When you're done, call us and we schedule the pickup.

Frequently asked questions

What size dumpster do I need for construction?

Most new-home and addition jobs use a 30 yard dumpster; large builds use a 40. Remodels and small additions usually fit a 20. Heavy debris such as concrete calls for a smaller container because of weight limits.

Can I keep the dumpster for the whole project?

Rental periods are set by the local hauler and listed on your quote. For long projects ask for extra days or scheduled swaps when you call.

Can I put concrete in a construction dumpster?

Often yes, but concrete is heavy, so it usually goes in a 10 or 20 yard container and some haulers require it to be kept clean of other debris. Tell us before booking.

Not sure what size you need?

Call us with the project and we'll size it with you, then book it with a local hauler.

(844) 392-5596
Call (844) 392-5596Phones answered 24/7 · flat-rate quotes